Fee Schedules

This fee schedule summarizes special fees not otherwise provided for by ordinances of the City of Wyoming or statutes of the State of Michigan. The fees are specific to the area(s) of Assessor, Building Inspections, City Clerk, City Manager's Office, Engineering, Fire, Parks and Recreation, Planning, Police, Treasurer and Utilities.

Fee Schedules

I – ASSESSOR

Cross Reference Index 200.00
Failure to file a Property 5.00 per day
     
Transfer Affidavit 200.00 maximum
  Failure on the part of buyer to timely file, results in a fine of $5.00 per day, beginning 45 days after the transaction is consummated up to a maximum fine of $200.00
     
Land Division Application 100.00
  No charge for combination of properties with current parcel numbers
Photocopies 1.00
Residential Amenities Report 150.00

II - BUILDING INSPECTIONS DEPARTMENT

APPEALS:
  Construction Board of Appeals 350.00
  Housing Board of Appeals 200.00
 
  Zoning Board of Appeals  
    Residential (one - and two-family) and accessory uses 275.00
    All other uses 525.00
    Interpretations 250.00
    Special meeting (requested by petitioner) 300.00

For the purpose of computing fees based on valuation, all construction cost other than for residential buildings, including underground and surface improvements, shall be based upon the value of cost of a building project as determined by the contract price, including all subcontracts such as electrical, plumbing, mechanicals, parking lots, etc. The building applicant shall present evidence of these costs to the Building Official.

Fee for work without a permit:
  If any work is commenced before a permit is obtained, an administrative investigation and process fee equivalent to 200% of the appropriate fee set forth herein shall be paid to the City before a permit is issued.
BUILDING PERMITS:
       
  Commercial, industrial, and multi-family estimated construction value/permit formula:
  Base Fee - First $1,000 of value 60.00
  $1,000 - $15 million cost - base fee & $7.00 per $1,000 value, plus 25% plan review  
  $15 million and over cost - use above rate, and then add $5 per $1,000 valuation and 20% plan review for balance of project value  
 
  Construction costs for residential valuation computation (per sq. ft.)
  1st Floor (including one bath) 70.00
  2nd Floor 65.00
  Unfinished walkout 2000.00
  Finished walkout area 25.00
  Porches and decks (per sq. ft.) 15.00
  Attached accessory buildings, garage, etc. 20.00
  Detached accessory buildings, garage, etc.(>120 sq ft) 22.00
  Fireplace chimney with one fireplace 2,000.00
  Additional fireplace on same chimney 750.00
  Extra full bath 3,500.00
  Extra half bath 2,500.00
 
  Miscellaneous building/land use fees:  
  Modular homes in parks 150.00
 
  Sign permits (per sign):  
  Pedestrian sign (annual) 35.00
  Permanent 100.00
  Portable (per week) 35.00
  Temporary Signs (per week)
including trailer mount, banners, flags, streamers, balloons - for specific requirements see City Zoning Code Chapter 90, Article XXIII Signs
35.00
 
  Swimming Pools:  
  Bonding and insurance fees related to Section 1906.1 of the City Code follow:
  Construction bond 1,000.00
  Insurance (City named as additional insured) 200,000.00
  Swimming Pools (above ground) 90.00
  Swimming Pools (in ground) 140.00
 
  Gasoline, explosive oils and naphtha storage tank installation 140.00
  Gasoline station storage tank permits (abandoned or closed gas stations, per tank) 70.00
  Initial license 700.00
  Annual renewal 350.00
  Peat mining  
  Initial license 700.00
  Annual renewal 350.00
  Zoning compliance letter 25.00
     
  Extra Inspection: fees and deposits  
 
  1. Extra inspection fees and deposits shall apply only to projects where the building permit is issued for $250,000 or less of construction value as determined by the Code. Permits for residential barrier free entry ramps and residential siding installations are exempt from deposits.
     
  2. "Extra inspection" shall mean any building inspection in addition to the inspections listed below:
 
 
  1. Residential house, addition and alteration permits: foundation rough-in, final, plus one additional;
  2. Residential garage, pools, and miscellaneous permits: 2 inspections;
  3. Commercial/industrial/multi-family permits: foundation, rough, firestop, final plus one addition; and
  4. Sign permits: 2 inspections.
 
  1. A fee of $40.00 shall be charged for each extra inspection.
     
  2. A fee of $60.00 per inspection shall be charged for requested inspections where no permit is required.
     
  3. Deposits for extra inspection fees:
    Each building and sign permit applicant shall pay a $120.00 deposit in addition to any permit fees. The deposit will be held by the City and shall be refunded at the close of the permit if extra inspections are not required. Any extra inspections shall be charged against the deposit balance (at a rate of $40.00 per inspection). If the balance becomes zero, the City may issue a stop-work order until an additional deposit of $120.00 is paid. Expired permits and occupancy or use prior to receiving final approval or a Certificate of Occupancy shall result in forfeiture of the deposit.
     
  4. Under special circumstances, an inspector, with the approval of the Chief Inspector, may waive an extra inspection fee.
Electrical Permits:
       
  Electrical Application fee  
  (Non-refundable and includes 1 inspection) 50.00
  Annual factory permit (includes 2 inspections) 130.00
  Administrative fee (work w/o permit) 80.00
  Each additional Inspection 40.00
  Minimum fee, new construction / Single-family (this fee covers all wiring installed) (MI Residential Code, includes three inspections) 200.00
  Special Inspection (per hour for carnival, fair, event, etc.) 60.00
  Conduit, grounding or temperature only 45.00
  Written report (per hour) 60.00
  Certificates 60.00
  Hazardous Location Doubles Permit Total Fee double
  Services and subpanels:  
  Meter Set or Mast Repair 10.00
  Temporary Service (each location) 17.00
  Up to 200 Amp 17.00
  Over 200 - thru 600 Amp 30.00
  Over 600 - thru 1000 Amp 60.00
  Over 1000 Amp / GFPE / Over 600 V 100.00
  Alternative Power (Solar, Wind, etc)  
  System and first 10 KW 40.00
  Each additional 1 KW    4.00
  Fire Alarms  
  System and up to 10 devices 60.00
  Each additional device 6.00
  Circuits of wiring and data/communications outlets  
  General Branch Circuit 10.00
  Lighting Branch Circuit 10.00
  Addition, alteration, repair existing, replace per 25 devices or lighting 10.00
  Electric Range 10.00
  Electric Dryer 10.00
  Each furnace or A/C 10.00
  Data/Communication outlets per 20 10.00
  Microwave 10.00
  Electric Water Heater 10.00
  Vehicle Charging Station 20.00
  Heating Device (per 5000 Watts) 10.00
  Pool/Hot Tub (bonding, motor, light and includes 2 inspections 60.00
  Other Fixed Appliances 10.00
  Signs  
  Illuminated signs, per circuit 20.00
  Neon Trans / LED power supplies (per unit) 20.00
  Bus Ducts and Feeders  
  Feeders (per 50') 11.00
  Bus Duct (per 50') 11.00
  Motors, Generators, Transformers (per HP or KVA)  
  Up to 5 HP/KVA 10.00
  Over 5 - thru 75 HP/KVA 25.00
  Over 75 HP/KVA 50.00
     
  1. Electrical contractor's license, $60 for term of license.  
  2. Facility Contractors License $60 for term of license.  
  3. Fire alarm contractor, $60 for term of license.  
  4. Sign specialty contractor, $60 for term of license.  
     
  Mechanical (Heating, Cooling, A/C) Permits:  
  Mechanical Application fee  
  (Non-refundable and includes 1 inspection) 50.00
  Administrative fee (work w/o permit) 80.00
  Commercial  
  Underground Inspection 40.00
  Rough-In Inspection 40.00
  Final Inspection 40.00
  Additional Inspections 40.00
  A/C, Refrigeration Self-Contained     20.00
  A/C, Refrigeration Split System 30.00
  Chillers 95.00
  Chimney Factory Built / Chimney Liner 30.00
  Compressors 45.00
  Condensers 45.00
  Cooling Towers 45.00
  Evaporator Coils 30.00
  Gas/Oil Burning Equipment/Roof Top Unit 35.00
  Heaters (unit, space, water, gas logs, gas fireplace) 15.00
  Kitchen Hoods (add duct work) 30.00
  Solar Equipment Panels (including piping) 25.00
  Solid Fuel Equipment (wood or fireplace stoves) 30.00
  Tanks 13.00
  Testing 40.00
  Ventilation Units and Exhaust Fans  
  1 to 2,000 CFM 7.00
  2,001 CFM to 10,000 CFM 35.00
  Over 10,000 CFM 65.00
  Air Handler Units  
  1 to 2,000 CFM 20.00
  2,001 CFM to 10,000 CFM 40.00
  Over 10,000 CFM 65.00
  Miscellaneous Commercial  
  Air Cleaners and Humidifiers 10.00
  ERV or HRV 10.00
  Heat Pumps or VAV Boxes 10.00
  PTACS 10.00
  Commercial & Residential (based on each item bid price) Ductwork, Fire Suppression, Gas Piping, and Process Piping  
  Bid Price under $3,000 30.00
  $3,000 - $7,999 40.00
  $8,000 - $10,999 55.00
  $11,000 - $15,000 70.00
  Over $15,000 70.00
+ 11 for each 3,000 over 15,000
  Residential  
  Final Inspection 40.00
  Additional Inspections 40.00
  Air Conditioning Units 30.00
  Bath and Kitchen Exhaust Fans 5.00
  Chimneys Factory Built Class A 10.00
  Chimney Liners 5.00
  Heaters (unit, space, gas logs, gas fireplace) 15.00
  Heating System (furnaces add ductwork) 50.00
  Humidifiers 5.00
  Solid Fuel Equipment (wood or fireplace stoves) 20.00
  Water Heaters (new construction) 5.00
  Residential Replacement Equipment  
  Air Conditioning Units / Heat Pumps 20.00
  Furnaces 20.00
  Water Heaters 5.00
 
  1. Mechanical contractor's license, $15.00 for term of license.
 
       
  Plumbing Permits:    
  Plumbing Application Fee
(Non-refundable and includes 1 inspection)
50.00
  Administrative fee (work w/o permit) 80.00
  Each additional inspection 40.00
  Schedule of Plumbing Equipment    
  Backflow Preventer 5.00
  Backwater Valve 5.00
  Bath Tub / Shower 5.00
  Catch Basin, Sump, Roof Drain 5.00
  Dishwashing Machine 5.00
  Drinking Fountain 5.00
  Floor Drain 5.00
  Garbage Disposal 5.00
  Grease Trap, Oil Separator 5.00
  Laundry Tray, Stand Pipes 5.00
  Lavatory 5.00
  Lawn Sprinkler 5.00
  Refrigerator, Ice Machine, Water Connected Appliances 5.00
  Sink, 3 Compartment Pot & Pan 5.00
  Sink, Kitchen 5.00
  Sink Slop/Service 5.00
  Stacks: Soil, Waste, Vent, Re-Vent 5.00
  Urinal 5.00
  Water Heater 5.00
  Water Closet 5.00
  Water Distribution Pipe Interior   
  3/4" Water Distribution 6.00
  1" Water Distribution 10.00
  1-1/4" Water Distribution 20.00
  1-1/2" Water Distribution 25.00
  2" Water Distribution 30.00
  Over 2" Water Distribution 35.00
  Medical Gas - License Required   
  Medical Gas Piping (per outlet) 5.00
  Medical Gas Systems 50.00
  Exterior Work Only   
  Storm Sewer 60.00
  Water Service 60.00
  Sanitary Sewer 60.00
 
  1. Plumbing license registration, Master $15.00 for term of license.
 
Rental Inspection Fees  
  Rental properties with 4 or more units:  
  Initial inspection fee, per unit inspected 118.00
  Re-inspection fee, per unit inspected 90.00
  Rental properties with less than 4 rental units:  
  Initial inspection fee, per unit inspected 175.00
  Re-inspection fee, per unit inspected 111.00
  Unregistered or uncertified rental properties 500.00
  Manufactured Homes within a community:  
  Initial inspection fee, per unit inspected 118.00
  Re-inspection fee, per unit inspected 90.00
 
Vacant Building fees:  
  Vacant building inspection 50.00
  Vacant or Abandoned Residential Repair Permit (six month permit) 275.00
 
Code Enforcement Fees:
  1st offense - 150% of cost incurred by city
2nd offense - 200% of cost incurred by city
3rd offense - 300% of cost incurred by city
More than three offenses - The greater of 300% of the cost incurred by city or the cost incurred by city plus $1000 for each offense

III - CITY CLERK

       
All Business Licenses, except as described or otherwise provided: 50.00
Adult Businesses Initial:
250.00
Annual: 100.00
Assemblies, Outdoor 200.00
Auto Body Repair Garages 100.00
Automobile Sales New & Used Cars, Trucks, each lot 50.00
Automobile Wrecking Yard/Scrap Metal and Metal Processing 125.00
Carnival
  Nonrefundable application fee 75.00
  Additional permit fee per day 50.00
  Bond 1,000.00
  Insurance:
$3,000,000 Combined Single Limit for Occurrence, Aggregate & Property Damage Naming the City of Wyoming as Additional Insured
Christmas tree sales (outdoors) 50.00
Dance Hall 125.00
Day Care (7 or more children) 50.00
Dealer of Precious Metal & Gems 50.00
Fertilizing Services for Lawns, Shrubs or Trees 30.00/vehicle
Fireworks Permit, Discharge of Fireworks 300.00
  Insurance:
Worker's Compensations & Employer's Liability;
Michigan Statutory Limits of Liability;
General Liability $3,000,000 Combined Single Limit for Occurrence;
Aggregate & Property Damage Naming the City of Wyoming as Additional Insured;
Vehicle Liability Coverage and Michigan No-fault Coverages for owned, non-owned and hired vehicles $3,000,000 combined single limit.
Gasoline Service Station 150.00
Going out of Business/Auction 50.00
Health Club or Massage Establishment 50.00
Industrial Waste Disposal 300.00
Mfg. or Dist. of Paint, Lacquer, Varnish & Oil 100.00
Mfg. or Dist. of Solvents & Chemicals 100.00
Pawn Shops/Second Hand Stores 50.00
Vendor/Solicitor 50.00
Poison Gases (Inc. Exterminators & Fumigators) 100.00
Rubbish Hauler 30.00/vehicle
  Insurance:
$500,000/$1,000,000 Liability; $100,000 Property Damage
Snow Plowing 30.00/vehicle
  Insurance:
Automotive Liability/Combined Single Limit $1 Million Liability Amount (Occurrence/Aggregate) $1 Million/$2 Million
Policy must name the City of Wyoming as Additional Insured
Late Renewal
  The late renewal penalty at 30 days shall be 25% of the renewal license fee but not less than $10.00 and the late renewal penalty at 90 days shall be 50% of the renewal license fee but not less than $20.00.
Marriage Ceremonies performed by the Mayor 25.00
Notary Fee 5.00
On-Premise Liquor License Application 300.00
Precinct Maps 3.00
Code of Ordinances 100.00
Qualified Voter File Reports eMail:
N/C
Printed: .10 per page
Labels: .70 per page
CDs: 5.00 ea

IV - ENGINEERING DEPARTMENT

       
Administrative Fees:
  Preparation of Lien Contract 50.00
  Preparation of Restrictive Covenant (waived when prepared in connection with special assessment rule) 100.00
  Preparation or Review of Easements 200.00
General Engineering Fees:
  Fire Lines  
  Based on Construction 4%
  Minimum Fee 200.00
 
  Testing and Chlorination of water mains  
  Standard Rate 170.00/hr
  Overtime Rate 175.00/hr
  Double time Rate 225.00/hr
 
  Subdivision Inspection
  Based on Construction Cost 4%
  Minimum Fee 200.00
 
STANDARD SPECIAL ASSESSMENT RATES
 

Whenever the City Council decides to levy Special Assessments to defray the costs of any improvements, the following Standard Special Assessment Rates shall govern:

  Street Rate
  Rural Improvement – Residential 57.90/lf
  Full Improvement – Residential 93.50/lf
  Full Improvement – Commercial 118.00/lf
  Sanitary Sewer  
  Main – Residential 38.10/lf
  Main – Commercial 56.00/lf
  6 inch Service 2,460.00/ea
  8 inch Service 3,620.00/ea
  Watermain  
  Main – Residential 23.40/lf
  Main – Commercial 28.10/lf
  1 inch Service 1,400.00/ea
  1 ½ inch Service 1,400.00/ea
  2 inch Service 1,640.00/ea
  6 inch Service 4,060.00/ea
  8 inch Service 4,950.00/ea
  Storm Sewer  
  12 inch Lateral 1,410.00/ea
  15 inch Lateral 1,590.00/ea
  18 inch Lateral 1,860.00/ea
  Sidewalk  
  4 inch - Residential 18.10/lf
  6 inch – Commercial 25.30/lf
  8 inch – Industrial 29.70/lf
  Drive Approach  
  Standard 4 inch – Residential 30.10/sy
  Standard 6 inch – Commercial 43.00/sy
  Standard 8 inch – Industrial 53.00/sy
  Curb Return 2,880.00/ea
  Tapered Curb Return 5,170.00/ea
SITE DEVELOPMENT STORMWATER FEES
(Within Regional Detention Areas)
  Percent
Impervious
Stormwater
Fee ($/ac)
  5% 2,040.00
  10% 2,220.00
  15% 2,380.00
  20% 2,570.00
  25% 2,730.00
  30% 2,910.00
  35% 3,070.00
  40% 3,250.00
  45% 3,430.00
  50% 3,590.00
  55% 3,770.00
  60% 3,940.00
  65% 4,120.00
  70% 4,280.00
  75% 4,450.00
  80% 4,640.00
  85% 4,800.00
  90% 4,980.00
  95% 5,140.00
  100% 5,330.00
STREET PERMITS
  Minimum Insurance Policy Requirements:
Contact the Engineering Department for minimum coverage amounts
  Banners and Signs over right-of-way 40.00
  Building Mover's Permit 100.00
  Moving Oversized objects, less than 13 feet in width (per occurrence) 10.00
  Moving Oversized objects, greater than 13 feet in width (per occurrence) 25.00
  Moving Overweight objects (per occurrence) 75.00
  Work performed outside of normal working hours requiring City Supervision Actual Cost
  Drive Culverts (City Installed) Actual Cost
  Underground Utilities (parallel to centerline)
  Per lineal Foot 0.20
  Minimum Fee 125.00
  Residential Drive Approach Construction
  Concrete 110.00
  Asphalt 35.00
  Reconstruction 35.00
  Drive Removal (if performed separate from new Construction) 35.00
  Landscaping Grades 70.00
  Drive Grade Stakes (Only) 70.00
  Reconstruct Curb and Gutter 35.00
  Commercial Drive Approach Construction  
  Flared 200.00
  Radius 370.00
  Tapered  
  Based on Construction Cost 4%
  Minimum Fee 200.00
  Reconstruct Existing Drive 150.00
  Drive Removal (Not Replaced) 50.00
  Reconstruct Curb and Gutter (Less than 50 feet) 40.00
  Reconstruct Curb & Gutter (50 feet or greater) 150.00
Sidewalk Construction
  New Construction 180.00
  Reconstruction (Less than 50 feet) 35.00
  Reconstruction (50 feet or greater) 150.00
  ADA Ramps 180.00
  Restaking 70.00
Lane Closure 100.00
Street Opening 500.00
Trenchless Road Crossing 175.00
Traffic Closure (Detour) 600.00
Parkway Opening 60.00
Storm Sewer 35.00
Utility Connection 70.00
Resurfacing Pavements  
  Asphalt Actual Cost
plus 25%
  Concrete Actual Cost
plus 25%
  All street opening patches shall be replaced by a qualified Contractor or by the City of Wyoming (at the expense of the applicant)
  Miscellaneous
  All work within the right-of-way not covered in the above fees 50.00
  Sign Return  
  For return of each sign removed from public property 5.00
  Portable Basketball Hoop (PBH) Return  
  For return of each PBH removed from public property 25.00
 
Telecommunications Permit
  Right-of-Way Telecommunications Permit 500.00
  Modified Right-of-Way Telecommunications Permit for DAS/Small Cell License 500.00
     
Wireless facility installation permit 220.00
Wireless facility and new utility pole installation permit 330.00
Wireless facility annual fee 22.00
Wireless facility on pole added after March 12, 2019 138.00
  Note: The Wireless facility fees are set by others and change annually in March  

V- FIRE DEPARTMENT

       
Wyoming Fire Department Training Center Established annually by Chief based on labor and maintenance costs
False Alarms
  1st, 2nd, or 3rd False Alarm 0
  4th False Alarm 250.00
  5th and subsequent False Alarms increase by 50.00 every alarm thereafter
  False fire alarms caused by on site Alarm Company employees 100.00 each occurrence

VI- PARKS AND RECREATION

         
SOFTBALL
Lemery, Palmer, and Lamar Parks  
  Day Time Resident Non-Resident
Practice Mon-Sun 1  hour block 30.00 45.00
Games Mon-Sun 1 hour block 50.00 75.00
  Mon-Sun All Day 250.00 375.00
Lighting   Per game 50.00 50.00
Field Prep: Line, rake, drag   Per game 50.00 50.00
BASEBALL
Lamar Park Grandstand and Gezon Park
  Day Time Resident Non-Resident
Practice Mon-Fri 1 hour block 40.00 60.00
  Mon-Sun 1 hour block 50.00 75.00
Games Mon-Sun 1 hour block 60.00 90.00
    All Day 260.00 390.00
Lighting   Per game 50.00 50.00
Field Prep-Line, rake, drag   Per game 50.00 50.00
 

SOCCER/FOOTBALL FIELDS 

Day Time   Resident Non-Resident
All Days 1 hour block Practice 30.00 45.00
    Games 50.00 50.00
 
TENNIS
Lemery, Lamar and Jackson Parks
  Day Time Resident Non-Resident
Courts Mon-Sun 1 hour block 15.00 22.50
 
VOLLEYBALL
  Day Time Resident Non-Resident
  Mon-Sun 1 hour block 15.00 22.50
 
BASKETBALL
Lamar and Battjes Park
  Day Time Resident Non-Resident
  Mon-Sun 1 hour block 15.00 22.50
 
PARK AND STRUCTURE RENTALS
           
SECTIONS Day Time Resident Non-Resident
    Mon-Sun Half day 30.00 45.00
  Mon-Sun Full day 60.00 90.00
         
SHELTERS Day Time Resident Non-Resident
Pinery
  Mon-Sun Half day 60.00 90.00
    Mon-Sun Full day 120.00 180.00
Gezon South, Ideal, Lamar, Oriole
  Mon-Sun Half day 80.00 120.00
  Mon-Sun Full day 160.00 240.00
Deposit (Refundable) 75.00 75.00
         
LODGES Day Time Resident Non-Resident
Ideal Mon-Fri Half day 60.00 90.00
    Sat-Sun Half day 120.00 180.00
  Mon-Fri Full day 120.00 180.00
  Sat-Sun Full day 160.00 240.00
         
Pinery Mon-Fri Half day 150.00 225.00
    Sat-Sun Half day 175.00 262.00
    Mon-Fri Full day 300.00 450.00
  Sat-Sun Full day 350.00 525.00
Deposit (Refundable) 100.00 100.00
   
   
PORTABLE STAGE      
  Day Time Within Wyoming  
    (8 AM - 11 PM)    
Stage Mon-Fri Per day 300.00  
  Sat-Sun Per day 325.00  
         
Extension panels Mon-Fri Per day 450.00  
  Sat-Sun Per day 487.50  
Deposit     100.00  
SPECIAL EVENTS      
Major Special Event Application Fee (nonrefundable) $60.00
Minor Special Event Application Fee (nonrefundable) $30.00
                  (Fees do not apply to Residential Neighborhood Block Parties)
 

SENIOR CENTER

Day Time Resident Non Resident Technology Fee Deposit
Mon-Sat 1 hour block 100.00 150.00 75.00 200.00
       
LIBRARY MEETING ROOM RENTAL
Meeting Room
Resident
Base Rate
Non-Resident
Base Rate
Additional
Hour Rate
Technology
Fee
Deposit
Required
A
25.00
50.00
20.00
0.00
50.00
B
50.00
75.00
20.00
25.00
50.00
C
25.00
50.00
20.00
0.00
50.00
A & B
75.00
125.00
20.00
25.00
100.00
B & C
75.00
125.00
20.00
25.00
100.00
A, B, & C
100.00
175.00
50.00
25.00
100.00
Bookmark
30.00
60.00
20.00
0.00
50.00

VII - PLANNING AND DEVELOPMENT

       
PLANNED UNIT DEVELOPMENTS
  (For overall review only; separate additional fees are required for individual projects within the PUD)
  Under 41 acres 700.00
  41 acres or over 1,200.00
  Major Revisions (as determined by Planning Director) 250.00
REQUEST FOR ZONING CODE TEXT AMENDMENT 600.00
REZONING PETITION
  Under 1 Acre    600.00
  1 Acre or over 1000.00
RIGHT-OF-WAY VACATIONS
  Residential 75.00
  Nonresidential 200.00
SITE PLAN REVIEW
  Apartments, Townhouses, Condominiums Other types of Multiple Family 600.00
  ... plus $4.00 per unit up to 1,800.00
  Commercial, Industrial, Others:
  Site size under one acre 400.00
  Site sizes one acre or over 600.00
Additions:
  Site sizes under one acre 200.00
  Site sizes one acre or over 300.00
  ... except building additions under 700 square feet 100.00
SPECIAL PLANNING COMMISSION MEETINGS
  (Requested by petitioner) 500.00
SPECIAL USE APPLICATION 500.00
SUBDIVISION OR PLAT APPROVAL
  Preliminary Plat-Tentative Approval (One-time fee covers Preliminary Plat-Final Approval and Final Plat Approval) 600.00
  ...plus per lot 6.00
ZONING CONFIRMATION LETTERS 25.00
MOBILE FOOD VENDOR LICENSE APPLICATION
  Annual License 50.00
  Annual License with Fire Inspection 175.00

VIII - POLICE DEPARTMENT

       
False Alarms / 4th and 5th calls 75.00
  6th or more calls, each 200.00
Local Background Check (pre-employment, INS, housing) 10.00
Notary Fee 5.00
OWI Cost Recovery Schedule - Per minute charges including fringe benefits
    Regular Rate OT Rate
  Patrol Officer 1.4006 1.4777
  Patrol Vehicle   0.1208 N/A
  Evidence Technician 1.1112 1.0813
  Detective 1.5071 1.6165
  Sergeant 1.5818 1.7158
  Crime Scene Van 0.2292 N/A
  Clerical 10.00 per incident
  Search Warrant/Fax 10.00 per incident
  Medical testing As billed to the City
  Jail Lodging As billed to the City
 
  Fire Lieutenant 1.1848 1.2438
  Fire Fighter 1.0892 1.1217
  Fire Equipment Operator 1.1280 1.1711
  Fire Vehicles 100.00 per incident
  Public Works Maintenance II 1.0602 0.0100
  Traffic Maintenance Technician II 1.2617 1.2713

IX - TREASURER

Duplicate Bill or Statement, per copy 2.00
Non-Sufficient Funds Check 25.00
Late Fee on Past Due Invoices 1.5% per month

(Does not apply to any invoice or bill with a late fee proscribed by contract, statute, ordinance or other Fee Schedule.)

X - UTILITIES

           
These fees will be effective as of: July 1, 2024  
 

WASTEWATER PENALTIES

 
Primary, Secondary and Tertiary Pollutants Average Quarterly Flow, gpd
Concentration Level 0-10,000
Gals/Day*
10,000-
50,000
Gals/Day*
50,000-
100,000
Gals/Day*
100,000
Gals/Day*
0-Limit (x) No penalty No penalty No penalty No penalty
>1(x) - 2(x) 56.87 113.74 170.64 227.51
>2(x) - 3(x) 113.74 227.51 341.26 455.02
>3(x) - 4(x) 170.64 341.26 511.90 682.53
>4(x) 284.38 568.77 853.16 1,000.00**
(x) Individual limits as listed in Sections 86-292 (b) (1) (b) and 86-292 (b) (2) (b) and 86-292 (b) (3) (b), General Maximum Limits for Primary, Secondary and Tertiary Toxic Pollutants.
 
Average Quarterly Flow
 
pH
0-10,000
Gals/Day*
10,000-
50,000
Gals/Day*
50,000-
100,000
Gals/Day*
100,000
Gals/Day*
5.0 - 10.5 No penalty No penalty No penalty No penalty
4.0 - 4.9 17.08 34.14 51.20 68.27
3.0 - 3.9 45.50 91.00 136.51 182.01
0 - 2.9 85.32 170.64 341.26 853.16
10.6 - 10.9 17.08 34.14 51.20 68.27
11.0 - 11.9 45.50 91.00 136.51 182.01
>12.0 85.32 170.64 341.26 853.16
*Based on average day for previous quarter
** Maximum penalty allowed by law
 

TREATED GROUNDWATER DISCHARGE

The following fees for treated groundwater discharges to the POTW are established:
  (1) Permit fee, per permit issuance 199.07
  (2) Inspection fee, per inspection 170.64
WASTEWATER SURCHARGE RATES
  BOD Rate/lb. Up to 460 mg/L $0.00   >460 mg/L $0.190
  SS Rate/lb. Up to 260 mg/L $0.00   >260 mg/L $0.500
  Phosphorus Rate/lb. Up to 12 mg/L $0.00   >12 mg/L $4.800
  Oil and Grease Rate/lb. Up to 91 mg/L $0.00   >91 mg/L $0.210
  Ammonia Rate/lb Up to 32 mg/L $0.00   >32 mg/L $0.700
 

WATER METER INSTALLATIONS

  Water Meters*:  
  Meter Size       Charge
  5/8 inch     224.09
  1 inch     298.04
  AMI Endpoint     140.00
 
*For water meters larger than 1-inch, actual cost plus 10% will be charged.
 
WATER SERVICE INSTALLATIONS

The Public Works Department performs service installations to the water distribution system. Fees for 1-, 1.5--, and 2-inch installations must be paid in full at the Utility Billing Office before work can be done. Costing as indicated below, or actual charges based on Testing and Chlorinating hourly rates noted in Section IV plus additional equipment at current Act 51 rates plus actual material costs plus any additional necessary contracted work as billed by Public Works. A minimum of three working days' notice is necessary to ensure Miss Dig can mark all utilities prior to work being performed.

Water Service Installation to Stop Box (no excavation and/or restoration)

For water service installation work only, the following fees apply. Fee includes labor, equipment, and materials necessary to tap and install a water service up to and including the curb stop and stop box. Charges associated with excavating, dewatering, restoration, traffic control, or any other work necessary to provide access to the watermain is the responsibility of the requesting party and may be subject to other permitting and inspections fees.

   
  1"       900.00
  1.5"       1,400.00
  2"       1,750.00
  >2"  

Testing and Chlorinating hourly rates noted in Section IV plus additional equipment at current Act 51 rates plus actual material cost plus any additional necessary contracted work.
 

Water Service Installation to Stop Box (requiring excavation and/or restoration)
 
For water service installation work requiring excavation, installation, and restoration, the following fees apply. Fee includes labor, equipment, and materials necessary to tap and install a water service up to and including the curb stop and stop box. This fee includes any costs associated with excavating, dewatering, boring, restoration, traffic control, or any other work necessary to provide access to the watermain and restore the excavating area to its original status.
 
  1"   4,000.00
  1.5"   4,250.00
  2"   5,000.00
  >2" Testing and Chlorinating hourly rates noted in Section IV plus additional equipment at current Act 51 rates plus actual material cost plus any additional necessary contracted work.
 
Water System Development Charge by tap size  
  1 inch       1,308.18
  1 ½ inch       4,174.82
  2 inch       5,221.36
  3 inch       11,728.14
  4 inch       31,237.13
  6 inch       78,058.68
  8 inch       104,074.40
  12 inch       148,939.40
 
Sewer System Development Charge by water tap size  
  1 inch       1,301.36
  1 1/2 inch       4,166.84
  2 inch       5,192.92
  3 inch       11,687.18
  4 inch       31,119.95
  6 inch       77,831.17
  8 inch       103,770.70
  12 inch       155,649.80
 
WATER SERVICE

Quarterly Ready-to-Serve Charge is applicable to all customers with public water service. Ready-to-Serve Charge will be assessed whether or not the water meter is installed and whether of not water is being used. The Ready-to-Serve is not charged if the water service is capped because of destruction or demolition of the structure served by the lateral or for specific cases as decided by the Director of Public Works. If the owner of a residential, commercial, industrial, or other property requests cessation of service (i.e. water is turned off at the stop box and the meter is pulled) a Ready-to-Serve charge will be charged at the same rate as if a 5/8-inch meter was installed

  Water Meter Size      
  5/8 inch       29.11
  1 inch       59.70
  1 ½ inch       128.13
  2 inch       198.06
  3 inch       343.69
  4 inch       642.25
  6 inch       1,322.92
  8 inch       2,226.76
 
Water commodity rate (in addition to Readiness to Serve Charge):
  Quantity steps applicable rate,
per 100 cubic feet:
2.02
       
SEWER SERVICE

Quarterly Ready-to-Serve Charge is applicable to all customers with public sewer service. Ready-to-Serve Charge will be assessed whether or not sewer is being used. The Ready-to-Serve is not charged if the sewer lateral is capped because of destruction or demolition of the structure served by the lateral or for specific cases as decided by the Director of Public Works. If the owner of a residential, commercial, industrial, or other property requests cessation of service (i.e. water is turned off at the stop box and the meter is pulled) a Ready-to-Serve charge will be charged at the same rate as if a 5/8-inch meter was installed.

  Water Meter Size     Charges
  5/8 inch or no meter     22.98
  1 inch       40.10
  1 1/2 inch       74.44
  2 inch       108.70
  3 inch       263.06
  4 inch       434.60
  6 inch       863.29
  8 inch       1,292.04
  12 inch       1,984.96
Sanitary Sewer commodity rate (in addition to Readiness to Serve Charge):
  per 100 cubic feet (hereinafter referred to as billing unit) of water use per quarter: $4.17

Residential sewer billing units shall be determined by using 1.15 times the water use for the winter quarter which is hereby defined as any 3 months between November 1 and April 30. However, when the winter quarter use is less than 10 billing units, then 10 billing units shall be used. Provided, however, that in no case shall the billing units for sewer be greater than the total water use for any particular quarter.

Effective July 1, 2022, the minimum charge per quarter for those residential sewer users not served by the City’s water system shall be $50.56 plus the applicable Ready to Serve Charge.

 
LATE CHARGE        

A penalty of 10% of current charges for water and sewer will be added to any bill paid after the due date on the bill.

Customers with sewer only service shall have a service charge of 1 ½ percent per month assessed on the unpaid balance for that delinquent portion of their bill which becomes a lien placed on the property tax roll.

 
FIRE SPRINKLER CONNECTION
(per year charge applicable to unmetered connections):
  4 inch and smaller connections to City main 164.96
  6 inch connection to City main  519.88
  8 inch connection to City main 883.88
  10 inch connection to City main 1,820.08
  12 inch connection to City main 2,959.88
 
MISCELLANEOUS FEES
  Cash Deposit for Section 86.43(4) 150.00
  Collection Cost Recovery Fee 40.00
  AMI Opt-Out Fee (per read) 30.00
  Deposit for Hydrant Backflow Preventor 500.00
  Water Construction Fee (60 days) 80.50
  Pool Filling Permit:  
  Homeowner and contractor 80.50
  Miscellaneous Hydrant Usage:  
  Used one day 80.50
  Used after first day 80.50
    • Plus metered usage at current water rate
• Plus 100% 
  Unauthorized hydrant use, penalty of   500.00
  Unauthorized water use, penalty of   500.00
 
  NPDES Permit Treated Groundwater
  The permit fee for treated groundwater discharge shall be $.08 per 100 cubic feet.
 
WASTE HAULERS    
The following fees for waste haulers permitted to discharge to the POTW are established. Fees shall be assessed quarterly.
 
Leachate haulers Treatment Fee, per 100 cubic feet discharged 8.98
Miscellaneous waste haulers including septage haulers:
  (to be paid in advance)             $80.47 per 1000 gallons per load,
or fraction thereof

XI- MANAGER'S OFFICE

       
Application fee for P.A. 328 of 1998
  Tax Abatement One-tenth of one percent (1/10th of 1%) of the total project cost, up to a maximum $10,000 fee
 
  Brownfield Redevelopment Authority Project
  Application fee 1,000.00
  Direct costs in excess of $1,000 Actual
  Tax Increment Finance MEDC review 1,000.00